WIPs
In an effort to leave behind a legacy of *finished* quilts rather than a large fabric stash and a pile of UFOs, I’m using my blog to journal my works-in-progress and the creative process behind some of my projects. My challenge for 2007 was to spend some time piecing each day–for at least 15 minutes a day for as many days as I could. It seems as though I only managed to quilt for half the year. Now, in 2008 I’m working on 9 WIPs that I’d like to get to the finished top stage before I’m needing to pack everything up in anticipation of moving.
|
Using Memory Lane pattern from Laps from Fats Book III |
Wedding Quilt for DS-N and future DIL-K |
1) Cut fabrics | Cutting FQs for blocks as of 19 January 2008 |
|
|
Scrappy Musical Quilt I had planned this quilt for another purpose, but think I’ll give it to my kid’s music teacher. |
1) Sew blocks together 2) Sew top together |
56 blocks done as of 23 January 2008 |
|
Using Leftovers Again? |
Scrappy Quilt #2 |
1) Sew blocks together 2) Sew top together |
Began sewing blocks December 2007 |
|
|
Goose on the Loose quilt top Material purchased: June 2006 |
1) Sew flying geese units together
2) Sew flying geese to pinwheel units & sew together into 12″ blocks 3) Lay out blocks 4) Sew top together |
Triangle units cut using QIAD flying geese ruler as of 12 August 2006. |
|
|
My Double Wedding Ring quilt top Project started: January 2005 |
1) Sew arcs to melons 2) Sew melons to centers |
* |
| Grandmother’s Flower Garden Quilt Project started: October 2005 |
1) Finish collecting fabrics | Have 82 sets out of 110 needed as of 8 January 2008 |
|
|
* |
Grandmother’s Flower Garden table runner Project started: October 2005 |
1) Finish basting to templates
2) Piece |
Started sewing flowers together January 2008 |
|
Hand appliqued quilt of my own design depicting elements from Psalms 8 |
Psalms 8 Quilt Top | 1) Finish assembling background
2) Freezer paper appliqué pieces |
Have background assembled & most of appliqué pieces drawn as of 1 March 2007 |
|
|
By Wisdom a House is Built wallhanging by Sarah Sporrer of Indygo Junction Project started: 2005 |
1) Need patterns for last 4 blocks
2) Fabrics for last 6 blocks — have backgroud fabrics |
Have fabrics set aside for first 6 blocks and backing material for last 6 blocks. |
|
|
Piecemaker’s God Shed His Grace on Thee Project started: February 2005 |
1) Freezer paper patterns | Have all fabrics set aside. |
| This is one of my favorites from Bonnie’s website. Since I’m moving to Tulsa, I thought I’d start cutting up scraps for it. :o) |
1) Cut scraps and sort |
Started January 2008 |
This is my list of future projects that may or may not get made. . . some day!
Actually I’ve set all these aside and will be packing them up in anticipation of
moving.
| Pictures | Project Name | Next Step | Completed |
| Quilts of My Own Design | |||
|
I need a small wallhanging for a quilt rack/shelf hanging in the studio |
Broken Dishes for Quilt Studio |
1) Cut fabrics for quarter square triangles |
Fabrics purchased 17 January 2007 |
|
My own design using yoyo hearts and fabrics from Jessica’s 2 quilts |
Love Blossoms | 1) Audition fabrics for background, vase, borders
2) Freezer paper letters |
Have 14 yoyo hearts ready as of 23 February 2007 |
|
My own design using Linda’s drawings |
Hey Diddle Diddle Redwork Wallhanging | 1) Collecting red & white fabrics
2) Embroider redwork |
Have 4 drawings by Linda |
|
My own design using Linda’s drawings |
Grandma’s Kitchen Redwork Wallhanging | 1) Collecting red & white fabrics
2) Embroider redwork |
Have 5 of Linda’s drawings I want to use. |
|
|
Leader and Ender project (9 patch with hourglass alternate block) Project started: July 2007 |
1) Cut fabrics for hourglass alternate blocks |
9 patches completed as 22 January 2008 |
|
Free pattern from Bonnie at Quiltville.com |
Happy Scrappy Houses Wallhanging #1 Stand Out from the Crowd |
1) Cut & fuse words to borders
2) Make piping 3) Hand quilt |
Top completed January 2008 |
|
Quilts from Patterns I want to do |
|||
|
|
Project started: October 2005 for Mom & Dad–before Dad passed away in October 2006. I was going to add borders & make it into a quilt, but now it’s going to be a wallhanging for Mom’s bedroom. | 1) Freezer paper templates
2) Iron on appliqué pieces |
* |
|
* |
Mauve & Green tablecloth Project started: May 2005 |
1) Finish piecing | * |
|
|
Women of the Bible quilt — Yahoo group | * | |
|
|
Women of the Bible quilt |
|
Completed first block 09 August 2006. |
|
|
Quilting the Psalms — Yahoo group | 1) Collecting fabrics | * |
|
|
DD-J’s Plaid Pinwheel quilt top Material purchased: February 2005 |
1) Cut 108 2 1/2″ strips–3 from each plaid fabric
2) Cut 108 2 1/2″ strips from background fabric 3) Piece top |
* |
|
|
Storybook Farm wallhanging Project started: 2005 |
1) Collecting fabrics | * |
|
|
In Full Bloom by McKenna Ryan of Pine Needles Oh, my! I just saw this as I was updating my webpage. I just *have* to have it! I love McKenna’s designs. |
1) Purchase patterns | * |
|
|
Sylvia’s Bridal Sampler from the Elm Creek Quilts novels series | 1) Start collecting fabrics | I’m adding this project on 5 September 2006–I *love* this one and the patterns are free! LOL |
|
|
Bridge to Landscape project | * | |
|
|
Country Road project | * | |
|
|
Red Barn project | * | |
|
|
Favorite Things Redwork Pattern | * | |
|
Projects from classes that need to be finished |
|||
| Tote That Mat class project Project started: Summer 2005 (or 2004?) |
1) Hand quilting on pocket blocks
2) Assemble |
* | |
|
|
Miniature Landscapes Project started: Summer 2005 (or 2004?) |
1) Sandwich
2) Machine quilt 3) Frame |
* |
| Art for Quilters Project started: Summer 2005 (or 2004?) |
* | ||
| Viewpoints Project started: Summer 2005 (or 2004?) |
* | ||
|
Miscellaneous Things I want to do |
|||
|
|
Purse Pattern | * | |
|
Frontier Flannel Quilted Sweatshirt Jacket from Thread Bare Patterns |
Sweatshirt Jacket Pattern | * | |
| Schlep Bags | * | ||
























